SITE SELECTION AND FIELD SEASON
2005-2006 Field season
- Improvement of the strength of the trench roof
- Set-up of the drill tower, winch and drill system
- Drilling down to 607.7 m (480 m drilled in 20 days)
- Cutting and packing the ice between 0-478 m (478 m)
Field team 12 person: It-Fr
Scientific Leader: V. Maggi
Drill Leader: F. Frascati
Field Manager: S. Poli
M. Armeni, L. Degli Esposti, S. Fabbri, S. Nucci, S. Panichi, F. Parrenin, P. Possenti, A. Quintavalla, G. Teste
|
|
|
|