Home Site selection and field season 2005-2006 Field season

 

 

 

SITE SELECTION AND FIELD SEASON

2005-2006 Field season

  • Improvement of the strength of the trench roof
  • Set-up of the drill tower, winch and drill system
  • Drilling down to 607.7 m (480 m drilled in 20 days)
  • Cutting and packing the ice between 0-478 m (478 m)
Field team 12 person: It-Fr
Scientific Leader: V. Maggi
Drill Leader: F. Frascati
Field Manager: S. Poli
M. Armeni, L. Degli Esposti, S. Fabbri, S. Nucci, S. Panichi, F. Parrenin, P. Possenti, A. Quintavalla, G. Teste