SITE SELECTION AND FIELD SEASON
2006-2007 Field season
- Drilling down to 1300.58 m (692 m drilled in 36 days)
- Cutting and packing the ice between 479-667 m; 1002-1300 m (486 m)
- 335 m of brittle ice (between 667 and 1001 m) have been stored in the two buffers at Talos Dome
Field team 9: It-Fr-UK
Scientific Leader: J. Chappellaz
Drill Leader: F. Frascati
Field Manager: N. La Notte
O. Alemany, S. Panichi, P. Possenti, A. Quintavalla, J. Triest, R. Udisti
|
|
|
|