SITE SELECTION AND FIELD SEASON
2007-2008 Field season
- Drilling down to 1620.20 m (320 m drilled in 15 days)
- Cutting and packing the ice between 667 and 1000 m, 1300 and 1620 m (655 m)
- Camp cleaning and closure, preparing access to the borehole later on
Field team 10: It-Fr-G
Scientific Leader: V. Maggi
Drill Leader: F. Frascati
Field Manager: N. La Notte
M. Armeni, V. Delgado, E. Lefevre, S. Panichi, P. Possenti, A. Quintavalla, C. Ritz
|
|
|
|